← Back to all alternatives

At-02e At02-lu Web figure_8-1-2a Web figure_8-2-5a

Click the images above to view the full-size .PDFs in a new window, and use the arrows to toggle between different views and information.

AT2

Resembling the earliest concepts of connecting 172nd to 190th, this alternative proposes a new roadway heading north-northeast beginning from a point on 172nd just south of the Wooded Heights Road intersection and connecting to 190th at Cheldelin. The new roadway cuts diagonally across existing properties, many of which are larger than 5 acre parcels. This alternative proposes a 5-lane arterial for the primary movement from 172nd to 190th; therefore, four lanes with a landscaped median/turn lane will be constructed on 172nd from Sunnyside north to the new roadway, along the entire portion of the new roadway, and on 190th Drive from Cheldelin to the County line. A 3-lane section is proposed to improve SE Foster Road, Cheldelin, Hemrick, and Tillstrom. Minor realignments will reposition the Tillstrom/Foster Road connection approximately 800 feet south of the existing intersection. North of Wooded Heights Road, SE 172nd Avenue will be reconstructed as a 3-lane section to the County line and Cheldelin will be extended west to intersect with 172nd.

Provide your feedback